Moss Gold Project

The Moss Gold Project, located in Ontario, has a current resource with significant upside

Under-drilled gold asset with infill and expansion drilling necessary

35+ km long mineral trend with multiple other mineralized zones and targets ready for follow-up

8+ km IP expression associated with the Moss Gold Deposit only delineated over 2.5 km 

Map of Moss Lake Deposits

* Moss Gold inferred resource includes 121.7M tonnes at 1.1 g/t Au containing 4.17M oz Au. See Nov. 15, 2022 news release for more information.

** Click here to view disclaimer regarding Historical Resources and Production

View Corporate Presentation

Recently announced Mineral Resources Estimate (MRE) of 6.00M Oz Au at 1.02 g/t Au (Inferred) including 3.35M Oz Au high-grade shear domain at 1.84 g/t Au*

*Please see May 8, 2023 Press Release for information on MRE.

Click here to view disclaimer regarding Historical Resources and Production

Regional map of ontario and other mining properties

Mineralization hosted on adjacent and/or nearby and/or geologically similar properties is not necessarily indicative of mineralization hosted on the Moss Gold Project.

Extensive Historical exploration work already completed on the property with plans for accelerated development

timeline

Late 1800’s to 1950

First generation of prospecting results in the discovery multiple high-grade gold occurrences and the North Coldstream Cu-Au-Ag Deposit, 2.7Mt of production at 1.89% Cu, 0.56 g/t Au, 5.59 g/t Ag

timeline

1970’s

Gold exploration intensifies with Falconbridge Exploration of the Snodgrass Lake prospect

timeline

1985

Original Moss Lake Deposit showing stripped and washed by Tandem/Storimin JV

timeline

1986-1990

Extensive drilling and 1,000 m of underground development work completed by several groups, first resource estimates and metallurgical work

timeline

1990’s

Moss Lake Gold Mines completes 17 hole drilling program in 1996, multiple geophysical surveys, and historic data compilation study

timeline

2000’s

Moss Lake Gold Mines continues exploration with several modest drill campaigns and further geological and geophysical surface programs, updated resource estimate in 2010

timeline

2010’s

PEA completed by Moss Lake Gold Mines in 2013, ownership amalgamated by Wesdome Gold Mines in 2014 with Coldstream and Hamlin properties acquired in 2016, further exploration and drilling programs in 2016 and 2017 confirmed extensions of mineralization along strike*

** Click here to view disclaimer regarding Historical Resources and Production

Moss Gold Historical Drill Hole Highlights¹

Map of Moss Lake Deposits

** Click here to view disclaimer regarding Historical Resources and Production

¹ Drill hole composites based on a cut-off grade of 0.3 g/t Au and may include up to 10m of internal dilution. The data disclosed here relating to drilling results is historic in nature. Neither the Company nor a qualified person has yet verified this data and therefore investors should not place undue reliance on such data. The Company’s future exploration work will include verification of the data.

Moss Gold Deposit*

 

  • 108,000 m in 376 holes between 1983 and 2017
  • 1.44 g/t Au over 72.8 m (89-172)
  • 1.19 g/t Au over 163.1 m (87-101)
  • 1.30 g/t Au over 178.6 m (87-100)

Iris Lake Deposit*

  • 5,600 m scout drilling in 2011
  • 11.4 g/t Au over 7.9 m (IL-11-02)
  • 254 g/t Au over 0.5 m (IL-11-12)
  • 1.28 g/t Au over 29.7 m (IL-11-20)

East Coldstream Deposit*

  • 38,000 m in 139 holes between 1988 and 2017
  • 4.86 g/t Au over 27.3 m (C-10-15)
  • 1.12 g/t Au over 111.3 m (C-10-16)

Hamlin Zone*

  • 9,000 m in 26 holes between 2008 and 2011
  • 0.90 g/t Au and 0.35% Cu over 150.7 m (HAM-11-74)

Moss Gold Project has extensive infrastructure to support potential district scale mining camp

Highway 11 / Yonge Street – Trans-Canada Highway

Road, Rail, People, Contractors, Water, Natural Gas Supplies, Government

Power - $0.10 / kwh power at project site

Recent VTEM survey reveals 29 undrilled high priority targets and expands prospectivity

. Strike Length for Moss Gold targets expanded from 2.5km to 11km

An active drill program with impactful results

Significant resource potential being identified in early drill holes

Strong copper & cobalt findings found at North Coldstream deposit

Qualified Person

Peter Flindell, P.Geo., MAusIMM, MAIG, Vice President – Exploration of the Company, a qualified person under NI 43-101 has approved the scientific and technical information contained in the website.

Recent Moss Gold News

Goldshore Intersects 5.64 g/t Au over 15.65m at East Coldstream

Significant Mineralization Outlined 13km Northeast of the Moss Lake Deposit VANCOUVER, B.C., February 27, 2023: Goldshore Resources Inc. (TSXV: GSHR / OTCQB: GSHRF / FWB: 8X00) (“Goldshore” or the “Company”), is pleased to announce assay results from its ongoing...

Goldshore Intersects 9.46 g/t Au over 7.45m in the Southwest Zone

Widths of Mineralized System Expanded Significantly VANCOUVER, B.C., February 2, 2023: Goldshore Resources Inc. (TSXV: GSHR / OTCQB: GSHRF / FWB: 8X00) (“Goldshore” or the “Company”), is pleased to announce assay results from its ongoing 100,000-meter drill program at...

Goldshore Announces Filing of Technical Report for the Moss Lake Project

VANCOUVER, B.C., December 12, 2022: Goldshore Resources Inc. (TSXV: GSHR / OTCQB: GSHRF / FWB: 8X00) (“Goldshore” or the “Company”), further to its press release of November 15, 2022, confirms that it has filed pursuant to National Instrument 43-101 Standards of...

Explore Goldshore Resources

Team

Meet the experienced team behind the scenes at  Goldshore Resources

News

Checkout the latest on what Goldshore Resources has been up to

Investors

Everything you need to know to start investing in Goldshore Resources